Two documents cover putting the populated boards on the bench:

Page When to use it
First bench session The first time you bring the new branch up. Linear procedure with explicit pass/fail checkpoints; covers Step 0, Phases 2–7b, Phase 8 of the reference, plus TLP250-protection checks at every step. Start here.
Bring-up reference Comprehensive phase-by-phase reference with what-the-firmware-does, scope captures, UART output, and troubleshooting trees. Consult when the first-session doc doesn't match what you're seeing.

The procedural reference is also in Build Guide v4.0 — §12 Bring-up procedure. Where the first-session notes contradict the guide, the session notes win — they describe what was actually seen, not what was expected.