Skip to content

Supervisor

Assoc. Prof. Dr. Rasım Doğan — supervisor for the ELE 401 / 402 graduation project, Hacettepe University EEE.

Role on the project

The supervisor's role was to (a) ensure the project met the graduation deliverable spec — 5 distinct cascade output levels visible without an output filter — and (b) provide oversight on the safety and engineering practice appropriate to a project that drives power stages.

Specific checkpoints:

Checkpoint What was reviewed
Topology selection CHB vs. NPC vs. Flying Capacitor argument; CHB approved.
Component selection MOSFET vs. IGBT analysis (quantitative), TLP250 gate-driver choice.
Power scaling decision The team's choice to scale the bench prototype to 100 V cascade output and 5 A AC was approved at the 23 October 2025 project meeting — see the meeting-notes summary.
PCB fab order approval Each iteration's gerber pack required supervisor review before the JLCPCB order.
Bench bring-up sessions Supervisor presence required for any session involving the populated boards under load.
Demo readiness Sign-off on the demo procedure + the safety chain before the public demonstration.

Project-meeting takeaways

The 23 October 2025 meeting set the bench-prototype scaling decision — the inverter is a low-power proof-of-concept (100 V cascade, 5 A AC, ≈ 700 W), not a production deployment. Specifically:

  • Bobinin (inductor) power rating must match the planned load (≥ 5 A continuous).
  • MOSFET voltage selection must be justified against the bus voltage with margin.
  • Per-MOSFET thermal measurement is required on the bench to confirm safe operation.

These constraints flowed into the iteration-1 component selection and stayed valid through to iteration 4 (the IRFZ44N → IRFB4110 swap was driven by exactly the VDSS-margin point the supervisor flagged at this meeting).